Twin Home ↳ Brain · inside Home Thesis Foundation Contact
← Tesseract
Development Strategy Platform

Tesseract Twin

See what others can't.

A digital twin that models the complete 6-stage Mumbai development lifecycle, from feasibility through completion, with zone-aware costing, regulatory intelligence, and dynamic execution-risk scoring. Built on data from MahaRERA, Knight Frank, CBRE, JLL, and Anarock, calibrated across 9 zones and 405 decision variables.

BETA
Tesseract Twin V7.0 overview: Mumbai zone selection with live zone data, FSI calculator with DCPR composition, and a shortfall alert
9 zones, live market data
FSI composed from DCPR tables
The 6-Stage Execution Lifecycle

Six gates. Every one modelled.

Every Mumbai development passes through six critical gates. The Twin models each one with zone-specific costs, regulatory logic, and capital chain analysis.

STAGE 01FeasibilityLand cost, ASP benchmarks, zone selection
STAGE 02Land Lock-inAcquisition structure, title clearance, stamp duty
STAGE 03RegulatoryFSI computation, DR and TDR strategy, DCPR compliance
STAGE 04CC ApprovalBMC commencement, phased vs accelerated paths
STAGE 05ConstructionCost phasing, escalation, escrow compliance
STAGE 06CompletionAbsorption, revenue realisation, final settlement
Platform Capabilities

Calibrated against real projects, not averages.

Every capability is grounded in Mumbai's specific regulatory environment and live project data, then wired into one engine where every input moves every output.

Zone Aware Engine

Nine zones with calibrated ASP ranges (₹18,000 to ₹1,50,000 per sqft), construction cost benchmarks, FSI regulations, and Ready Reckoner rates sourced from MahaRERA, IGR Maharashtra, and industry reports.

FSI & Development Rights

DCPR 2034-compliant FSI calculator with road width, zone, and project type inputs. Models fungible FSI, TDR acquisition costs, and BMC premium financing across four payment schemes.

Funding Waterfall

Left-to-right capital consumption: equity first, then debt, then pre-sales under 70% RERA escrow, then bridge financing. Automatic shortfall detection with visual alerts at the exact stage.

Dynamic Risk Scoring

Per-stage success metrics roll into a live composite risk score. Every variable feeds the score in real time as assumptions change, with a stage health matrix flagging where projects strain.

Monte Carlo & Decision Flow

Risk analysis across 1,000 simulated scenarios, plus a project decision flow that shows cumulative cash committed and the cost of bailing at every gate.

Tax & Realism Layer

Labour cess and corporate income tax are built into the cost stack, with explicit GST treatment choices. KPIs surface both pre-tax and post-tax, so the numbers survive a CFO's review.

COMPARETwo fully independent scenarios, side by side
OFFLINEThe entire platform ships as one HTML file
REPORTBoardroom-ready PDF in one click
Analytics

From assumptions to evidence.

The analytics deck turns the model into arguments: where the money goes, where it comes from, what moves profit, and how sensitive the outcome is to each assumption.

Tesseract Twin analytics: cost breakdown by stage, funding waterfall, construction cost composition, and profitability waterfall
COSTS
Cost breakdown by stageWhere capital is consumed across the six gates.
CAPITAL
Funding waterfallEquity, debt, pre-sales, and shortfall, stage by stage.
PROFIT
Profitability waterfallRevenue to post-tax profit, with every deduction visible.
SENSITIVITY
Sensitivity analysisASP, area, cost, DR, and interest, ranked by impact on profit.
Under the Hood

A model you can audit.

The Twin is an engineered financial instrument. The numbers below are the model's own, not marketing rounding.

9
Zones modelled
405
Decision variables per project
500+
Financial formulas in the engine
574
Automated tests, 100% pass
MahaRERAKnight Frank India CBRE South AsiaJLL India AnarockIGR Maharashtra DCPR 2034UDCPR 2020 COA StandardsCIDCO Norms
See What Others Can't

Test the project before the project tests you.

Request a walkthrough of the Twin with your own project assumptions.